{"id":9658,"date":"2025-09-13T01:30:07","date_gmt":"2025-09-13T01:30:07","guid":{"rendered":"https:\/\/imiapower.com\/?p=9658"},"modified":"2025-09-15T01:25:14","modified_gmt":"2025-09-15T01:25:14","slug":"usb-wall-chargers-import-certifications-guide","status":"publish","type":"post","link":"https:\/\/imiapower.com\/tr\/usb-wall-chargers-import-certifications-guide\/","title":{"rendered":"\u00c7in&#039;den USB Duvar \u015earj Cihaz\u0131 \u0130thal Etmek \u0130\u00e7in Hangi Sertifikalar Gereklidir?"},"content":{"rendered":"<p data-start=\"298\" data-end=\"678\">USB duvar \u015farj cihaz\u0131 ithalat\u0131 sadece fiyat veya MOQ ile ilgili de\u011fil, ayn\u0131 zamanda uyumlulukla da ilgilidir. Tedarik\u00e7iler, sat\u0131c\u0131lar ve distrib\u00fct\u00f6rler, g\u00fcmr\u00fckten ge\u00e7ip yasal olarak satabilmek i\u00e7in \u00fcr\u00fcnlerinin k\u00fcresel g\u00fcvenlik, EMC ve \u00e7evre standartlar\u0131n\u0131 kar\u015f\u0131lad\u0131\u011f\u0131ndan emin olmal\u0131d\u0131r. \u0130\u015fte, \u00fcreticiler ve test laboratuvarlar\u0131yla verimli bir \u015fekilde \u00e7al\u0131\u015fma ipu\u00e7lar\u0131n\u0131n yan\u0131 s\u0131ra, b\u00f6lgelere g\u00f6re gerekli sertifikalar hakk\u0131nda pratik bir B2B rehberi.<\/p>\n<h2 data-start=\"685\" data-end=\"747\">USB Duvar \u015earj Cihazlar\u0131 i\u00e7in Temel Sertifikalar (H\u0131zl\u0131 Genel Bak\u0131\u015f)<\/h2>\n<ul data-start=\"749\" data-end=\"1498\">\n<li data-start=\"749\" data-end=\"815\">\n<p data-start=\"751\" data-end=\"815\"><strong data-start=\"751\" data-end=\"762\">CE (AB)<\/strong> \u2013 LVD + EMC + RoHS&#039;yi (+ ge\u00e7erli oldu\u011funda ErP&#039;yi) kapsar.<\/p>\n<\/li>\n<li data-start=\"816\" data-end=\"888\">\n<p data-start=\"818\" data-end=\"888\"><strong data-start=\"818\" data-end=\"831\">UKCA (BK)<\/strong> \u2013 CE&#039;nin \u0130ngiltere&#039;deki kar\u015f\u0131l\u0131\u011f\u0131; benzer teknik gereksinimler.<\/p>\n<\/li>\n<li data-start=\"889\" data-end=\"987\">\n<p data-start=\"891\" data-end=\"987\"><strong data-start=\"891\" data-end=\"916\">UL \/ ETL (ABD\/Kanada)<\/strong> \u2013 Da\u011f\u0131t\u0131mc\u0131lar ve perakende platformlar\u0131 i\u00e7in yayg\u0131n olarak ihtiya\u00e7 duyulan g\u00fcvenlik i\u015fareti.<\/p>\n<\/li>\n<li data-start=\"988\" data-end=\"1041\">\n<p data-start=\"990\" data-end=\"1041\"><strong data-start=\"990\" data-end=\"1003\">FCC (ABD)<\/strong> \u2013 EMC uyumlulu\u011funu sa\u011flar (B\u00f6l\u00fcm 15).<\/p>\n<\/li>\n<li data-start=\"1042\" data-end=\"1090\">\n<p data-start=\"1044\" data-end=\"1090\"><strong data-start=\"1044\" data-end=\"1059\">PSE (Japonya)<\/strong> \u2013 AC \u015farj cihazlar\u0131 i\u00e7in zorunludur.<\/p>\n<\/li>\n<li data-start=\"1091\" data-end=\"1140\">\n<p data-start=\"1093\" data-end=\"1140\"><strong data-start=\"1093\" data-end=\"1113\">KC (G\u00fcney Kore)<\/strong> \u2013 G\u00fcvenlik ve EMC konular\u0131n\u0131 kapsar.<\/p>\n<\/li>\n<li data-start=\"1141\" data-end=\"1231\">\n<p data-start=\"1143\" data-end=\"1231\"><strong data-start=\"1143\" data-end=\"1174\">RCM (Avustralya\/Yeni Zelanda)<\/strong> \u2013 G\u00fcvenlik + EMC (+ enerji verimlili\u011fi) i\u00e7in birle\u015fik i\u015faret.<\/p>\n<\/li>\n<li data-start=\"1232\" data-end=\"1294\">\n<p data-start=\"1234\" data-end=\"1294\"><strong data-start=\"1234\" data-end=\"1249\">BIS (Hindistan)<\/strong> \u2013 USB \u015farj cihazlar\u0131 i\u00e7in zorunlu kay\u0131t.<\/p>\n<\/li>\n<li data-start=\"1295\" data-end=\"1378\">\n<p data-start=\"1297\" data-end=\"1378\"><strong data-start=\"1297\" data-end=\"1313\">G-\u0130\u015fareti (GCC)<\/strong> \u2013 K\u00f6rfez \u00fclkelerindeki d\u00fc\u015f\u00fck gerilimli ekipmanlar i\u00e7in uygunluk i\u015fareti.<\/p>\n<\/li>\n<li data-start=\"1379\" data-end=\"1498\">\n<p data-start=\"1381\" data-end=\"1498\"><strong data-start=\"1381\" data-end=\"1402\">CB Plan\u0131 (IECEE)<\/strong> \u2013 Tedarik\u00e7ilerin birden fazla pazar i\u00e7in tek bir g\u00fcvenlik testinden yararlanmas\u0131na yard\u0131mc\u0131 olan uluslararas\u0131 test raporu.<\/p>\n<\/li>\n<\/ul>\n<h2 data-start=\"1505\" data-end=\"1545\">B\u00f6lgesel Sertifikasyon Gereksinimleri<\/h2>\n<h3 data-start=\"1547\" data-end=\"1584\"><strong data-start=\"1551\" data-end=\"1582\">Avrupa Birli\u011fi (CE \u0130\u015faretlemesi)<\/strong><\/h3>\n<p data-start=\"1585\" data-end=\"1650\"><strong data-start=\"1585\" data-end=\"1602\">Gerekli olanlar:<\/strong> AB&#039;de sat\u0131\u015f yapan tedarik\u00e7iler ve distrib\u00fct\u00f6rler.<\/p>\n<ul data-start=\"1651\" data-end=\"1876\">\n<li data-start=\"1651\" data-end=\"1702\">\n<p data-start=\"1653\" data-end=\"1702\">Y\u00f6nergeler: LVD, EMC, RoHS, ErP (varsa)<\/p>\n<\/li>\n<li data-start=\"1703\" data-end=\"1772\">\n<p data-start=\"1705\" data-end=\"1772\">Temel standartlar: EN\/IEC 62368-1, EN 55032\/55035, EN 50563\/IEC 62301<\/p>\n<\/li>\n<li data-start=\"1773\" data-end=\"1876\">\n<p data-start=\"1775\" data-end=\"1876\">\u0130pucu: \u00dcreticinizden test raporlar\u0131, risk de\u011ferlendirmesi ve DoC i\u00e7eren bir CE teknik dosyas\u0131 isteyin.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"1878\" data-end=\"1901\"><strong data-start=\"1882\" data-end=\"1899\">Amerika Birle\u015fik Devletleri<\/strong><\/h3>\n<ul data-start=\"1902\" data-end=\"2173\">\n<li data-start=\"1902\" data-end=\"1947\">\n<p data-start=\"1904\" data-end=\"1947\">EMC uyumlulu\u011fu i\u00e7in FCC B\u00f6l\u00fcm 15 (S\u0131n\u0131f B).<\/p>\n<\/li>\n<li data-start=\"1948\" data-end=\"2037\">\n<p data-start=\"1950\" data-end=\"2037\">G\u00fcvenlik a\u00e7\u0131s\u0131ndan UL veya ETL listelenmi\u015ftir; genellikle distrib\u00fct\u00f6rler ve e-ticaret platformlar\u0131 taraf\u0131ndan gereklidir.<\/p>\n<\/li>\n<li data-start=\"2038\" data-end=\"2093\">\n<p data-start=\"2040\" data-end=\"2093\">\u015earj cihaz\u0131n\u0131n yeterli olmas\u0131 durumunda DOE\/CEC enerji verimlili\u011fi.<\/p>\n<\/li>\n<li data-start=\"2094\" data-end=\"2173\">\n<p data-start=\"2096\" data-end=\"2173\"><strong data-start=\"2096\" data-end=\"2104\">U\u00e7:<\/strong> \u00dcr\u00fcn CE belgesine sahip olsa bile UL\/ETL testleri gerekebilir.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2175\" data-end=\"2206\"><strong data-start=\"2179\" data-end=\"2204\">Birle\u015fik Krall\u0131k (UKCA)<\/strong><\/h3>\n<ul data-start=\"2207\" data-end=\"2351\">\n<li data-start=\"2207\" data-end=\"2245\">\n<p data-start=\"2209\" data-end=\"2245\">AB teknik gerekliliklerini yans\u0131t\u0131r.<\/p>\n<\/li>\n<li data-start=\"2246\" data-end=\"2291\">\n<p data-start=\"2248\" data-end=\"2291\">UK DoC ve do\u011fru UKCA i\u015faretlemesi gerektirir.<\/p>\n<\/li>\n<li data-start=\"2292\" data-end=\"2351\">\n<p data-start=\"2294\" data-end=\"2351\">Kuzey \u0130rlanda, NI y\u00f6netmelikleri uyar\u0131nca CE kurallar\u0131n\u0131 takip eder.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2353\" data-end=\"2369\"><strong data-start=\"2357\" data-end=\"2367\">Kanada<\/strong><\/h3>\n<ul data-start=\"2370\" data-end=\"2442\">\n<li data-start=\"2370\" data-end=\"2401\">\n<p data-start=\"2372\" data-end=\"2401\">EMC i\u00e7in ISED (eski ad\u0131yla IC).<\/p>\n<\/li>\n<li data-start=\"2402\" data-end=\"2442\">\n<p data-start=\"2404\" data-end=\"2442\">G\u00fcvenlik sertifikasyonu i\u00e7in cUL\/cETL.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2444\" data-end=\"2458\"><strong data-start=\"2448\" data-end=\"2456\">Asya<\/strong><\/h3>\n<ul data-start=\"2459\" data-end=\"2708\">\n<li data-start=\"2459\" data-end=\"2538\">\n<p data-start=\"2461\" data-end=\"2538\"><strong data-start=\"2461\" data-end=\"2477\">Japonya (PSE):<\/strong> AC \u015farj cihazlar\u0131 i\u00e7in zorunludur; \u00fc\u00e7gen\/elmas i\u015fareti gereklidir.<\/p>\n<\/li>\n<li data-start=\"2539\" data-end=\"2608\">\n<p data-start=\"2541\" data-end=\"2608\"><strong data-start=\"2541\" data-end=\"2562\">G\u00fcney Kore (KC):<\/strong> G\u00fcvenlik + EMC; yerel dok\u00fcmantasyon gereklidir.<\/p>\n<\/li>\n<li data-start=\"2609\" data-end=\"2708\">\n<p data-start=\"2611\" data-end=\"2708\"><strong data-start=\"2611\" data-end=\"2627\">Hindistan (BIS):<\/strong> Bir\u00e7ok USB \u015farj cihaz\u0131 i\u00e7in CRS kayd\u0131 gerekiyor; BIS taraf\u0131ndan tan\u0131nan laboratuvarlarda test ediliyor.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2710\" data-end=\"2743\"><strong data-start=\"2714\" data-end=\"2741\">Avustralya ve Yeni Zelanda<\/strong><\/h3>\n<ul data-start=\"2744\" data-end=\"2812\">\n<li data-start=\"2744\" data-end=\"2812\">\n<p data-start=\"2746\" data-end=\"2812\"><strong data-start=\"2746\" data-end=\"2754\">RCM:<\/strong> G\u00fcvenlik + EMC birle\u015fik i\u015fareti; enerji verimlili\u011fi ge\u00e7erli olabilir.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2814\" data-end=\"2850\"><strong data-start=\"2818\" data-end=\"2848\">Orta Do\u011fu (K\u00f6rfez \u0130\u015fbirli\u011fi Konseyi \/ G-Mark)<\/strong><\/h3>\n<ul data-start=\"2851\" data-end=\"3000\">\n<li data-start=\"2851\" data-end=\"2935\">\n<p data-start=\"2853\" data-end=\"2935\"><strong data-start=\"2853\" data-end=\"2864\">G-\u0130\u015fareti:<\/strong> D\u00fc\u015f\u00fck voltajl\u0131 ekipmanlar; BAE, KSA, Katar vb. i\u00e7in b\u00f6lgesel uyumluluk.<\/p>\n<\/li>\n<li data-start=\"2936\" data-end=\"3000\">\n<p data-start=\"2938\" data-end=\"3000\">Ek yerel onaylara ihtiya\u00e7 duyulabilir, \u00f6rne\u011fin Suudi Arabistan&#039;da SASO.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"3002\" data-end=\"3018\"><strong data-start=\"3006\" data-end=\"3016\">Afrika<\/strong><\/h3>\n<ul data-start=\"3019\" data-end=\"3202\">\n<li data-start=\"3019\" data-end=\"3137\">\n<p data-start=\"3021\" data-end=\"3137\">\u00c7o\u011fu \u00fclke, PVoC programlar\u0131 (SGS\/Intertek\/T\u00dcV\/BV) kapsam\u0131nda sevkiyat \u00f6ncesi Uygunluk Sertifikas\u0131 (CoC) talep etmektedir.<\/p>\n<\/li>\n<li data-start=\"3138\" data-end=\"3202\">\n<p data-start=\"3140\" data-end=\"3202\"><strong data-start=\"3140\" data-end=\"3157\">G\u00fcney Afrika:<\/strong> NRCS LoA ve SANS uyumlu fi\u015f gereklidir.<\/p>\n<\/li>\n<\/ul>\n<h2 data-start=\"3209\" data-end=\"3263\">B2B Sat\u0131c\u0131lar\u0131, Tedarik\u00e7ileri ve Distrib\u00fct\u00f6rleri i\u00e7in \u0130pu\u00e7lar\u0131<\/h2>\n<ol data-start=\"3265\" data-end=\"3863\">\n<li data-start=\"3265\" data-end=\"3433\">\n<p data-start=\"3268\" data-end=\"3433\"><strong data-start=\"3268\" data-end=\"3295\">Bir CB raporuyla ba\u015flay\u0131n:<\/strong> Fabrikan\u0131zdan IECEE CB Test Raporu + Sertifikas\u0131 (IEC 62368-1) isteyin. Bu, UL\/ETL, CE\/UKCA, KC, RCM, BIS ve G-Mark&#039;a d\u00f6n\u00fc\u015ft\u00fcrmenize yard\u0131mc\u0131 olur.<\/p>\n<\/li>\n<li data-start=\"3434\" data-end=\"3532\">\n<p data-start=\"3437\" data-end=\"3532\"><strong data-start=\"3437\" data-end=\"3460\">BOM&#039;u erken kilitleyin:<\/strong> PCB, trafo veya plastiklerde yap\u0131lan de\u011fi\u015fiklikler test raporlar\u0131n\u0131n ge\u00e7ersiz say\u0131lmas\u0131na neden olabilir.<\/p>\n<\/li>\n<li data-start=\"3533\" data-end=\"3637\">\n<p data-start=\"3536\" data-end=\"3637\"><strong data-start=\"3536\" data-end=\"3569\">Etiketlemeyi ba\u015ftan planlay\u0131n:<\/strong> CE, UKCA, FCC, PSE, KC, RCM, BIS, G-Mark\u2014hepsinin kendine \u00f6zg\u00fc kurallar\u0131 vard\u0131r.<\/p>\n<\/li>\n<li data-start=\"3638\" data-end=\"3722\">\n<p data-start=\"3641\" data-end=\"3722\"><strong data-start=\"3641\" data-end=\"3665\">Sertifikalar\u0131 do\u011frulay\u0131n:<\/strong> D\u00fczenleyen kurumlarla \u00e7apraz kontrol yap\u0131n; sahte raporlardan ka\u00e7\u0131n\u0131n.<\/p>\n<\/li>\n<li data-start=\"3723\" data-end=\"3863\">\n<p data-start=\"3726\" data-end=\"3863\"><strong data-start=\"3726\" data-end=\"3755\">Pazar yeri gereksinimleri:<\/strong> Perakendeciler ve Amazon gibi platformlar s\u0131kl\u0131kla UL\/ETL, test \u00f6zetleri ve izlenebilir QA dok\u00fcmantasyonuna ihtiya\u00e7 duyarlar.<\/p>\n<\/li>\n<\/ol>\n<h2 data-start=\"3870\" data-end=\"3921\">B2B M\u00fc\u015fterileri i\u00e7in Minimum Uyumluluk Kontrol Listesi<\/h2>\n<ul data-start=\"3923\" data-end=\"4337\">\n<li data-start=\"3923\" data-end=\"3993\">\n<p data-start=\"3925\" data-end=\"3993\">Hedef pazarlar onayland\u0131 (AB\/BK\/ABD\/JP\/KR\/AU-NZ\/Hindistan\/K\u00f6rfez \u0130\u015fbirli\u011fi Konseyi\/Afrika-CoC).<\/p>\n<\/li>\n<li data-start=\"3994\" data-end=\"4043\">\n<p data-start=\"3996\" data-end=\"4043\">G\u00fcvenlik: IEC\/EN 62368-1 raporu (CB tercih edilir).<\/p>\n<\/li>\n<li data-start=\"4044\" data-end=\"4126\">\n<p data-start=\"4046\" data-end=\"4126\">EMC: EN 55032\/55035 (AB) + FCC B\u00f6l\u00fcm 15B (ABD) + yerel varyantlar (KC, RCM, ISED).<\/p>\n<\/li>\n<li data-start=\"4127\" data-end=\"4166\">\n<p data-start=\"4129\" data-end=\"4166\">Maddeler\/Enerji: RoHS + ErP\/MEPS.<\/p>\n<\/li>\n<li data-start=\"4167\" data-end=\"4250\">\n<p data-start=\"4169\" data-end=\"4250\">\u00dclke i\u015faretleri: CE \/ UKCA \/ UL-ETL \/ PSE \/ KC \/ RCM \/ BIS \/ G-Mark \/ Africa CoC.<\/p>\n<\/li>\n<li data-start=\"4251\" data-end=\"4337\">\n<p data-start=\"4253\" data-end=\"4337\">Etiketler ve dok\u00fcmanlar: \u0130\u015faretler, DoC, kullan\u0131c\u0131 k\u0131lavuzu, ithalat\u00e7\u0131 bilgisi, seri\/parti izlenebilirli\u011fi.<\/p>\n<\/li>\n<\/ul>\n<h2 data-start=\"4344\" data-end=\"4353\">SSS<\/h2>\n<p data-start=\"4355\" data-end=\"4394\"><strong data-start=\"4355\" data-end=\"4392\">ABD&#039;de sat\u0131\u015f yapmak i\u00e7in UL&#039;ye ihtiyac\u0131m var m\u0131?<\/strong><\/p>\n<ul data-start=\"4395\" data-end=\"4490\">\n<li data-start=\"4395\" data-end=\"4490\">\n<p data-start=\"4397\" data-end=\"4490\">Her zaman yasal olmasa da, da\u011f\u0131t\u0131c\u0131lar ve sigortac\u0131lar sorumlulu\u011fu azaltmak i\u00e7in s\u0131kl\u0131kla UL\/ETL talep ederler.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4492\" data-end=\"4522\"><strong data-start=\"4492\" data-end=\"4520\">Avrupa i\u00e7in CE yeterli mi?<\/strong><\/p>\n<ul data-start=\"4523\" data-end=\"4603\">\n<li data-start=\"4523\" data-end=\"4603\">\n<p data-start=\"4525\" data-end=\"4603\">Evet, CE dosyas\u0131 ge\u00e7erli test raporlar\u0131yla LVD + EMC + RoHS (+ ErP)&#039;yi kaps\u0131yorsa.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4605\" data-end=\"4642\"><strong data-start=\"4605\" data-end=\"4640\">En h\u0131zl\u0131 k\u00fcresel uyumluluk yolu:<\/strong><\/p>\n<ul data-start=\"4643\" data-end=\"4752\">\n<li data-start=\"4643\" data-end=\"4752\">\n<p data-start=\"4645\" data-end=\"4752\">IEC 62368-1 i\u00e7in CB raporu edinin \u2192 UL\/ETL, CE\/UKCA, KC, RCM, BIS, G-Mark&#039;a d\u00f6n\u00fc\u015ft\u00fcr\u00fcn \u2192 Afrika CoC&#039;yi d\u00fczenleyin.<\/p>\n<\/li>\n<\/ul>\n<h2 data-start=\"4759\" data-end=\"4776\"><strong data-start=\"4759\" data-end=\"4774\">\u00c7\u00f6z\u00fcm:<\/strong><\/h2>\n<p data-start=\"4778\" data-end=\"5062\">B2B tedarik\u00e7ileri, sat\u0131c\u0131lar\u0131 ve distrib\u00fct\u00f6rleri i\u00e7in, USB duvar \u015farj cihazlar\u0131 i\u00e7in k\u00fcresel sertifikasyon gerekliliklerini anlamak hayati \u00f6nem ta\u015f\u0131r. Uygun g\u00fcvenlik, EMC ve eko-sertifikalar\u0131n al\u0131nmas\u0131, pazara sorunsuz giri\u015f sa\u011flar, distrib\u00fct\u00f6rlerle g\u00fcven olu\u015fturur ve maliyetli g\u00fcmr\u00fck gecikmelerini \u00f6nler.<\/p>","protected":false},"excerpt":{"rendered":"<p>Importing USB wall chargers isn\u2019t just about price or MOQ\u2014it\u2019s about compliance. Suppliers, vendors, and distributors need to ensure their products meet global safety, EMC, and environmental standards to clear customs and sell legally. Here\u2019s a practical B2B guide on the certifications required by region, with tips for working efficiently with manufacturers and test labs. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9476,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rank_math_lock_modified_date":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[361],"tags":[],"class_list":["post-9658","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/posts\/9658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/comments?post=9658"}],"version-history":[{"count":3,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/posts\/9658\/revisions"}],"predecessor-version":[{"id":9661,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/posts\/9658\/revisions\/9661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/media\/9476"}],"wp:attachment":[{"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/media?parent=9658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/categories?post=9658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imiapower.com\/tr\/wp-json\/wp\/v2\/tags?post=9658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}